CASE STUDY — INDONESIA

Complete 1,000-Set/Day Commercial Laundry Plant

How HOZO Laundry equipped a fast-growing Indonesian commercial laundry with a complete washing, ironing, and folding production line — from factory visit to full commissioning.

PROJECT SUMMARY

Location

Surabaya, Indonesia

Industry

Commercial Laundry

Capacity

1,000 sets/day

Completed

2024

THE CHALLENGE

Scaling From Manual Operations to Industrial Production

A rapidly growing commercial laundry operator in Surabaya, Indonesia was processing around 300 sets per day using semi-automatic equipment. With hotel contracts increasing and demand projected to triple within 18 months, the existing setup could not keep up. Key challenges included:

  • Inconsistent ironing quality — manual flatwork finishing led to wrinkles and customer complaints from 4- and 5-star hotel clients
  • High labor costs — 12 operators were needed across two shifts to meet daily targets
  • No room for growth — the existing equipment was running at maximum capacity with zero buffer
  • Energy waste — mismatched machines from different brands made it impossible to optimize steam and gas consumption

The owner visited HOZO Laundry’s factory in Shanghai to evaluate whether a single-brand, fully integrated production line could solve all four problems simultaneously.

THE SOLUTION

Complete Washing, Ironing & Folding Production Line

After a thorough factory visit and capacity analysis, HOZO Laundry designed a complete production line tailored to the client’s 1,000 sets/day target. The solution centered on three integrated stages:

Washing Stage:XGQ-100 Washer Extractors (100kg each) paired with 2× HG-100 Tumble Dryers (100kg each), providing balanced wash-dry throughput with built-in redundancy.

Ironing Stage:YIII-3300 Three-Roller Flatwork Ironer with GSB-3300 Feeding Machine — the three-roller configuration handles the 1,000-set volume at comfortable speed without running at maximum capacity, leaving headroom for growth.

Folding Stage:ZD-3300V Folding Machine connected inline with the ironer output, plus a DM Stacking Machine for automatic bed sheet stacking.

All equipment was configured as a single integrated line: wash → dry → feed → iron → fold → stack — minimizing manual handling between stages and reducing the operator count from 12 to 5.

THE RESULTS

Measurable Impact After Commissioning

Sets Per Day Capacity
0 +
Labor Cost Reduction
0 %
Operators (Down From 12)
0
Quality Complaints Since Launch
0
PROJECT GALLERY

Factory Visit & Installation Photos

Photos from the client’s factory visit to HOZO Laundry Shanghai and the on-site installation in Surabaya.

SIMILAR SOLUTION FOR YOUR FACILITY?

Whether you’re upgrading from manual operations or building a new commercial laundry from scratch, HOZO Laundry provides complete turnkey solutions — from capacity planning to remote commissioning support.

Scroll to Top

Get A Free Quote Now !

Contact Form Demo (#3)
If you have any questions, please do not hesitate to contact us.