CASE STUDY — GREECE

Seasonal Resort Laundry Expansion

How HOZO equipped a Greek island resort chain with independent ironing and folding lines to handle extreme seasonal demand across 3 properties.

PROJECT SUMMARY

Location

Greek Island Resort Chain

Industry

Seasonal Resort / Hospitality

Equipment

6× YZ-3300 Ironers, HPT-1400 Pillowcase Line, ZD-3300V Folders, GSB Feeders

Capacity

8,000+ kg/day (peak season)

Flatwork ironer and folder combination at client laundry site
THE CHALLENGE

Extreme Seasonal Demand Across Multiple Island Properties

A Greek island resort chain faced a unique operational challenge: 5 months of near-100% occupancy from May through September, followed by 7 months of minimal operation. This extreme seasonality meant existing ironing capacity was woefully inadequate during peak season, yet investing in equipment that sits idle for more than half the year required careful justification.

Outsourcing during peak season proved unreliable — when every hotel on the island hits maximum occupancy simultaneously, local laundry services are overwhelmed. Inter-island linen transport was logistically complex and prohibitively expensive, ruling out a centralized processing model.

Adding to the engineering challenge, all equipment needed to withstand the harsh salt air environment and high humidity typical of Greek island locations, where standard steel components can corrode within a single season.

THE SOLUTION

Independent Ironing + Folding Lines for Each Property

HOZO equipped 3 island properties with independent ironing and folding lines, eliminating the need for inter-island linen transport entirely. Each property operates as a self-sufficient laundry unit capable of handling its own peak-season volume.

The core of each line is the YZ-3300 3-roller flatwork ironer (steam heated, 3.3m working width), chosen for its balanced throughput during peak season while maintaining simplicity for off-season maintenance. Six units were deployed across the three properties, with two ironers per location providing redundancy and parallel processing capacity.

A critical bottleneck was identified during the planning phase: small pieces like pillowcases were consuming approximately 35% of the main ironer capacity. HOZO solved this by installing dedicated HPT-1400 pillowcase ironing lines at each property, completely freeing the main ironers to focus on sheets and large flatwork.

ZD-3300V automatic folders and GSB feeders complete each line, creating a fully automated workflow from feeding to finished, folded linen. All equipment features stainless steel construction specifically for salt air resistance. A seasonal maintenance program with remote diagnostics ensures equipment is properly winterized during the off-season and ready to perform when the first guests arrive in May.

THE RESULTS

Measurable Impact

Peak-Season Capacity Coverage
0 %
Main Ironer Capacity Freed
0 %
Daily Across 3 Properties
0 + kg
Zero Corrosion Issues
0 + seasons
PROJECT GALLERY

Ironing & Folding Line Photos

Flatwork ironer for hotel linen processing
Pillowcase folder machine in commercial laundry operation
Washer extractors lined up in commercial washing zone

Facing Seasonal Capacity Challenges?

HOZO designs laundry solutions that scale with your demand — from single-property setups to multi-site deployments. Let us engineer a system that handles your peak season with confidence.

Scroll to Top

Get A Free Quote Now !

Contact Form Demo (#3)
If you have any questions, please do not hesitate to contatct with us.
Laundry equipment factory — 30 years of industrial washing machine manufacturing in Shanghai China
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.